Grid Code (GC)

The Grid Code details the technical requirements for connecting to and using the National Electricity Transmission System (NETS). Compliance with the Grid Code is one of the requirements of the Connection and Use of System Code (CUSC).

As the code administrator for the Grid Code, we maintain the code and oversee any proposed changes to it. All changes must be reviewed by the Grid Code Review Panel, and approved by the panel or Ofgem.

If you're interested in connecting to the NETS, find out more about the connections process.

For more information about the code, subscribe to the Grid Code mailing list or email us at: [email protected] 

Cyclist on top of mountain with sunset

Modification tracker

Our modification tracker gives you the most up-to-date details on current modifications for each of the four codes.

This includes the purpose of the modification, the stakeholders it affects, panel comments on prioritisation, and where it is in the review process.

We publish the tracker on the 7th of each month, or the following working day if the 7th falls on a non-working day.