C9 statements and consultations
We are required to establish statements and guidelines in accordance with special condition C9 of the statements of the NESO licence. On this page you will find all C9-related documents, including consultations.
Please note: as a result of the licence changes arising from the transition to NESO, the statements previously found under C16 of the transmission licence are now found under C9. The statements on this page currently refer to C16 as this was the correct licence condition at the time of consultation
Join our C9 Mailing List
To keep up to date with the latest C9 news and publications please sign up to our mailing list.
Here you can find the latest versions of C9-related statements including the Balancing Principles Statement Report and guidelines.
Latest versions
Here you can find previous versions of C9-related statements and guidelines.
Procurement Guidelines
Balancing services adjustment data (BSAD)
Balancing principles statement report
By accessing these reports, you are agreeing to our terms and conditions.
System management action flagging
System management action flagging (SMAF) report
Applicable balancing services volume data (ABSVD)
Balancing Principles Statement
On an annual basis, we undertake consultations in respect of the C9 statements. Where applicable we may be required to undertake additional consultations outside of the standard annual review.
Consultation videos
Name | Published |
---|---|
Local Constraints Market Price Adjustment Mechanism | 02 Sep 2024 |
Consultation documents
2023-24
2021-22
2020-21
2019-20
2018-19
2017-18
2017 ABSVD Informal
2016-17
2015-16
2014-15
2013-14
Name | Published Sort ascending |
---|---|
C16 Report to Authority 29 November 2013 | 18 Oct 2017 |
C16-RTA-INTERIM-2013-FINAL(1) | 18 Oct 2017 |
RTA-APP-B-1-COMBINED | 18 Oct 2017 |
RTA-APP-D-3-COMBINED | 18 Oct 2017 |
RTA-APP-F-1-COMBINED_201113 | 18 Oct 2017 |
RTA-APP-H-3-COMBINED | 18 Oct 2017 |
ETR Industry Document_5_Dec13 v 1 | 18 Oct 2017 |
APPENDIX-D-SMAF-V5_0 | 18 Oct 2017 |
APPENDIX-B-BSAD-V9_0 | 18 Oct 2017 |
C16-CONSULTATION-1314-v1_0 | 18 Oct 2017 |
2012-13
2011-12
2010-11
2009-10
Name | Published Sort ascending |
---|---|
TRACC paper | 18 Oct 2017 |
Consultation - P217A and Review | 18 Oct 2017 |
Consultation Report - BSAD and SMAF | 18 Oct 2017 |
SMAF - Appendix D | 18 Oct 2017 |
C16 Authority Report - Appendix G | 18 Oct 2017 |
C16 PG Appendix B - 'cat 5' | 18 Oct 2017 |
C16 Consultation document - 16 January 2009 (1) | 18 Oct 2017 |
Appendix E BPS plus plain english changes | 18 Oct 2017 |
Appendix G - SMAF P217A and Review changes | 18 Oct 2017 |
C16 Appendix F BPS plus plain english changes | 18 Oct 2017 |
These documents outline the GB methodology for commercial arrangements for payments relating to interconnector (IC) capacity restrictions resulting from NTC restrictions set by National Energy System Operator (NESO). The commercial arrangements in these documents should be applied to:
- all interconnector projects (existing and future) that are connected to the GB transmission system
- capacity calculations made both before and after the firmness deadline
This methodology should be applied in full to ensure consistency of NTC arrangements across all GB connected interconnectors.