Search results
Filter by
ESO content (38238)
Strategic planning
Great Britain’s NETS must continue to adapt and be developed so power can be transported from source to demand, reliably and efficiently.
Systems operation
Our colleagues are at the heart of the NESO, working hard to operate a safe and reliable electricity system all whilst supporting the transition to a greener, and more efficient system for future…
Future energy
At NESO our projects all contribute towards our effort to make the grid ready to operate with 100% zero carbon electricity by 2025.
Strategic planning
This NOA 2021/22 Refresh report provides recommendations for the options required to develop the onshore electricity transmission network, that complements the HND’s …
Strategic planning
The National Electricity Transmission System (NETS) of Great Britain was modelled with precision in DIgSILENT PowerFactory, using a 36-bus equivalent network. We divided the system into 36 zones,…
Energy 101
The UK is on a journey to achieving net zero emissions by 2050 and here at NESO we have our own ambition to be able to operate the electricity system with zero carbon by 2025.But there are many…
Future energy
The carbon intensity app has been built in partnership with the WWF, Environmental Defense Fund Europe and the University of Oxford department of computer science.Our app can be used by…
Energy 101
Generators connect onto the network in two ways – either as transmission connected generation or embedded generation. It can help to think of it like our roads network. The…
Energy 101
Generators (those who create power) connect onto the network in two ways – either as transmission connected generation or embedded generation. It can help to think of it…