Search results
Filter by
Content (116)
Balancing services
As NESO, our vision is to meet the future needs of the electricity system by making the most of all resources available on the system in a flexible and economic way.
Document
:
Balancing services
Summary of operational metering working group meeting 11.
Document
:
Balancing services
Project update slide deck presented at the 11th BM Operational Metering Working Group meeting.
Document
:
Balancing services
On a settlement period basis, the total balancing cost (per MWh) is given, alongside the total volume of services…
Document
:
Balancing services
On a settlement period basis, the total balancing cost (per MWh) is given, alongside the total volume of services…
Document
:
Balancing services
On a settlement period basis, the total balancing cost (per MWh) is given, alongside the total volume of services…
Document
:
Balancing services
On a settlement period basis, the total balancing cost (per MWh) is given, alongside the total volume of services…
Document
:
Balancing services
On a settlement period basis, the total balancing cost (per MWh) is given, alongside the total volume of services…
Document
:
Balancing services
Slides for Operational Transparency Forum
Balancing services
What is a skip?A skip occurs when a non-economic dispatch decision is made. If the NESO Control Room sends an instruction via BOA (Bid Offer Acceptance) at a higher price than an alternative action…