GSR016: Small and Medium Embedded Generation Assumptions
The Workgroup considers issues and interactions that arise when applying NETS SQSS Section 2 and Section 4 criteria due to the size of the connection(small and medium vs large), the connection point (transmission vs embedded), and the contractual arrangement (BM Participant vs Non-BM Participant).
Code Administrator Contact: [email protected]
Governance Route: Standard Governance
Impacts:
Medium: Transmission Licensees Generators
Low: Networks Operators
Implemented: 01 April 2019
Documents