Search results
Filter by
Datasets (3)
- CSV
Trading
National Energy System Operator (NESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as thermal, voltage or stability…,…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Network charges
This dataset contains a breakdown of all the Transmission Network Use of System (TNUoS) tariff elements of which are forecasted and set by the revenue team at National Grid ESO. These files will be…