Codes
CMP444 Code Administrator Consultation
10 Mar 2025
to 14 Mar 2025
Multi day
Consultations
This proposal seeks to socialise DRCE costs through wider TNUoS charges. Instead of the current system where offshore wind farm generators both (i) provide upfront capital costs for the DRCE before transferring to OFTO and (ii) cover the cost of DRCE via the offshore local circuit tariff for the lifetime of the project.