Consultations

CMP418 Second Code Administrator Consultation

29 January 2025 to 19 February 2025 - All Day
Codes
  / Connection and Use of System Code (CUSC)

This proposal seeks to socialise DRCE costs through wider TNUoS charges. Instead of the current system where offshore wind farm generators both (i) provide upfront capital costs for the DRCE before transferring to OFTO and (ii) cover the cost of DRCE via the offshore local circuit tariff for the lifetime of the project.