Search results
Filter by
Datasets (114)
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Trading
This dataset displays all upcoming electricity trades due to be delivered. To meet our forecast balancing requirements at minimum cost, we trade energy-related products. The data is refreshed every…
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…
- CSV
Balancing costs
A new dataset to calculate Skip Rates using the methodology developed with LCP Delta. For more information on this methodology see the Skip Rate section of the website. This dataset provides the skip…
- CSV
Generation
The dataset contains national and windfarm-level 0-14 Day Ahead wind forecasts for all the windfarms which provide real-time operational metering (SCADA telemetry) to the NESO. The forecasts are…
- CSV
Ancillary services
This dataset contains the results from daily auction for static FFR and buy orders. For service requirement see this page: Static FFR Requirements
- CSV
Generation
The dataset contains national and BMU-Level 0-14 day ahead wind forecasts for all the windfarms which are used to produce NESO's national day ahead incentive wind forecasts available here . The…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.