Search results
Filter by
Datasets (114)
- CSV
Ancillary services
As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating Reserve (STOR). The daily results from the auction are available here.
- CSV
- DOC
Generation
National Energy System Operator (NESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
- CSV
Carbon intensity
This dataset contains national carbon intensity forecast for the GB electricity system. The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Carbon intensity
This dataset contains regional carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Carbon intensity
This dataset contains country carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Ancillary services
The dataset contains forecasts of our Dynamic Containment Low and High requirements for the next 4-days. The methodology uses forecasted demand, inertia, and response volumes as well as a view of the…
- CSV
Ancillary services
The NG ESO publishes non-BM instruction data from our ASDP system once instructions have been confirmed by Service Providers. This information is then continuously published throughout the day on…
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…