Search results
Filter by
Datasets (114)
- CSV
Generation
The dataset contains national and windfarm-level 0-14 Day Ahead wind forecasts for all the windfarms which provide real-time operational metering (SCADA telemetry) to the NESO. The forecasts are…
- CSV
Generation
The dataset contains national and BMU-Level 0-14 day ahead wind forecasts for all the windfarms which are used to produce NESO's national day ahead incentive wind forecasts available here . The…
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Trading
This dataset displays all upcoming electricity trades due to be delivered. To meet our forecast balancing requirements at minimum cost, we trade energy-related products. The data is refreshed every…
- CSV
Carbon intensity
The carbon intensity of electricity measures how much carbon dioxide emissions are produced per kilowatt hour. This dataset contains data from 1 January 2009. It has seasonal decomposition applied to…
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…
- CSV
Carbon intensity
The carbon intensity of balancing actions measures the difference between the carbon intensity of the combined Final Physical Notice (FPN) of machines in the Balancing Mechanism (BM) and the…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.