Search results
Filter by
Datasets (4)
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Constraint management
This dataset contains the 24-month ahead constraint costs on a monthly basis for the main boundaries on the transmission system. These costs are the costs of managing constraint boundaries (for…