Search results
Filter by
Datasets (4)
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- ZIP
- GeoJSON
Network charges
This dataset contains approximate GIS (geographic information system) geospatial boundaries for each of the TNUoS generation zones in Great Britain. There are 27 TNUoS generation zones, and each is…