Search results
Filter by
Datasets (5)
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
System
This page holds the historic system frequency data for Great Britain at a 1 second resolution. It is the role of the National Grid ESO to keep the system frequency at 50 Hz, with a statutory limit of…
- XLSX
- CSV
- XLSM
Ancillary services
The Firm Frequency Response (FFR) post tender reports are published following each monthly tender. They indicate which tenders were accepted and rejected and the information submitted for these…