Search results
Filter by
Datasets (19)
- CSV
Generation
This dataset contains NRAPM (Negative Reserve Active Power Margin) forecast for Daily 2-14 days ahead and Weekly for 2-52 weeks ahead for both National and Scotland. The purpose of the NRAPM forecast…
- CSV
Constraint management
The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual…
- XLSX
- PNG
- CSV
Constraint management
Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds the capacity of the circuits connecting the two regions. This dataset provides…
- CSV
Constraint management
To give greater insight on balancing decisions, this post monthly report provides outturn system costs for maintaining voltage levels on the network. Maintaining the electricity system at the correct…
- CSV
Constraint management
This dataset gives information on the arming and disarming of units contracted under CMIS (previously known as Constraint Management Pathfinder). The information is provided for each instance of…,…
- CSV
Generation
Metered wind output in MW for Scotland, England, and Wales. Output is provided per date per settlement period. Please note that this data is from operational metering and is therefore expected to be…
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- CSV
Constraint management
This dataset contains the 24-month ahead constraint costs on a monthly basis for the main boundaries on the transmission system. These costs are the costs of managing constraint boundaries (for…
- CSV
Constraint management
This dataset contains a year ahead Mega Watt constraint limits for the main boundaries on the transmission system., NOTE:, This dataset has now been replaced by the "24 Months Ahead Constraint…