Search results
Filter by
Datasets (26)
- CSV
Generation
The dataset contains national and windfarm-level 0-14 Day Ahead wind forecasts for all the windfarms which provide real-time operational metering (SCADA telemetry) to the NESO. The forecasts are…
- CSV
Generation
The dataset contains national and BMU-Level 0-14 day ahead wind forecasts for all the windfarms which are used to produce NESO's national day ahead incentive wind forecasts available here . The…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead.
- CSV
- DOC
Generation
National Energy System Operator (NESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
- CSV
Constraint management
A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when the measurement was taken and will not reflect any changes in the flows following the…
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…