Search results
Filter by
Datasets (25)
- ZIP
- CSV
System
As part of our daily planning processes within the ESO control room, the control room strategy team produces a System Operating Plan (SOP) at key demand peaks or troughs throughout the day, at what…
- CSV
Constraint management
A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when the measurement was taken and will not reflect any changes in the flows following the…
- PNG
- CSV
Balancing costs
This dataset is a component of the Forward Plan 2020-21 commitment to increase the transparency of our operational decision making in the Balancing Mechanism (BM). It includes the publication of…
- CSV
Balancing costs
A new dataset to calculate Skip Rates using the methodology developed with LCP Delta. For more information on this methodology see the Skip Rate section of the website. This dataset provides the skip…
- CSV
System
This dataset contains an estimate of the outturn inertia and market provided inertia for Great Britain Transmission System.
- CSV
- XLSX
Balancing costs
There is a file for each run type we calculate a BSUoS charge for - Interim Initial (II), Settlement Final (SF) and Reconciliation Final (RF). These are updated daily with the actual Half Hourly…,…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Constraint management
The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual…
- CSV
System
This dataset gives indicative information on the availability and utilisation of Stability Pathfinder contracts. The information is provided at a settlement period resolution for all contracted units…