Search results
Filter by
Datasets (13)
- CSV
Balancing costs
A new dataset to calculate Skip Rates using the methodology developed with LCP Delta. For more information on this methodology see the Skip Rate section of the website. This dataset provides the skip…
- CSV
- XLSX
Balancing costs
There is a file for each run type we calculate a BSUoS charge for - Interim Initial (II), Settlement Final (SF) and Reconciliation Final (RF). These are updated daily with the actual Half Hourly…,…
- PNG
- CSV
Balancing costs
This dataset is a component of the Forward Plan 2020-21 commitment to increase the transparency of our operational decision making in the Balancing Mechanism (BM). It includes the publication of…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Balancing costs
The publication consists of constraint breakdown information to provide additional transparency of why as ESO we are taking actions on the system. Please note that tags applied to actions can…
- CSV
Balancing costs
This dataset provides indicative values for the average daily price (in £ per GVAs) for BM accepted offers tagged as being for System Inertia. It also includes the cost of bid actions required to…