Search results
Filter by
Datasets (17)
- CSV
Carbon intensity
This dataset contains national carbon intensity forecast for the GB electricity system. The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Carbon intensity
This dataset contains regional carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- XLSX
- PNG
- CSV
Constraint management
Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds the capacity of the circuits connecting the two regions. This dataset provides…
- XLSX
- CSV
Balancing costs
The Balancing Services Use of System (BSUoS) costs are reported on a monthly basis with a forecast for the next month and a rolling 24 month period. Here you can find the data for the 24 month ahead…
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- CSV
Constraint management
The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual…
- ZIP
- CSV
System
As part of our daily planning processes within the ESO control room, the control room strategy team produces a System Operating Plan (SOP) at key demand peaks or troughs throughout the day, at what…
- CSV
- XLSX
Balancing costs
There is a file for each run type we calculate a BSUoS charge for - Interim Initial (II), Settlement Final (SF) and Reconciliation Final (RF). These are updated daily with the actual Half Hourly…,…
- CSV
Carbon intensity
The carbon intensity of balancing actions measures the difference between the carbon intensity of the combined Final Physical Notice (FPN) of machines in the Balancing Mechanism (BM) and the…
- CSV
Constraint management
A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when the measurement was taken and will not reflect any changes in the flows following the…