We've got a wide range of publications offering energy insights and analysis. Download our reports and data to see the innovative ways we are transforming the future of Great Britain’s energy.
Filter by
Document
Compliance
The Gate 2 Criteria Methodology sets out the two parts of the Gate 2 Criteria; the Gate 2 Readiness Criteria and the Gate 2 Strategic Alignment Criteria and explains how Users evidence they have met the Gate 2 Readiness Criteria, and how such evidence is assessed
Document
Compliance
The Project Designation Methodology explains the reasons projects could be designated, sets out the criteria for designation and the process by which NESO will designate projects
Document
Compliance
The Connections Network Design Methodology (CNDM) describes how relevant generation and demand connections will be assessed and strategically designed in alignment with wider network planning activities.
Document
Compliance
NESO Connections Bay Sharing Policy November 2024
Document
Compliance
Customer Connections Seminar London 5 Nov 2024 Agenda
Document
Compliance
Letter to industry dynamic modelling July 24
Document
Compliance
Non-Compliance Self-Reporting (NCSR): ESO Overview: Customers who have reached a Connections Contract / Bilateral Agreement with National Grid ESO (NGESO) and are aware of a non-compliance or suspected non-compliance against any of the requirements of the Grid Code must notify National Grid ESO immediately. Importantly, a non-compliance or suspected non-compliance can equally be raised by other connection stakeholders, particularly Transmission Owners and / or by NGESO respectively. The process of non-compliance reporting can be summarised into the following stages of interaction: Process: