GSR021: Operational and Planning Criteria for 220kV Transmission Assets

With the introduction of the first 220kV transmission assets onto the NETS, the planning and operational criteria needs to be modified within the NETS SQSS to include this new voltage level, especially considering it is believed that further 220kV AC projects will be developed in the future for the connection of some offshore wind farms.

Modification status:
Concluded - GSR021: Operational and Planning Criteria for 220kV Transmission Assets
Last updated:
20 March 2024

 