CAP168: Transmission Access – Under-use and reallocation of TEC

CAP168 centres on the introduction of an under-use charge for transmission entry capacity (TEC). Incentivised by an under-use charge (additional to TNUoS payments) based on a pre-set multiple of TNUoS payments, parties would make available TEC they do not require by assigning the right to use such TEC to third parties on a bilateral basis. This might be on either a temporary basis within-year or for longer-term blocks of a year (or both). In the case of within-year provision already exists under CUSC 6.34 for CUSC parties to offer unwanted TEC to other grid users but only in certain defined circumstances, and this has not been utilised. Consequently CAP168 would introduce a daily and a weekly access product. Annual blocks could also be sold individually or in multi-year bundles under this proposal.

Modification status:
Concluded - CAP168: Transmission Access – Under-use and reallocation of TEC
Last updated:
20 March 2024

Code Administrator Contact: Bali Virk - [email protected]

Governance Route: Urgent

Documents