Skip Rate - In Merit Post System Action

"Post System Action Skip Rate" – A more targeted measure of avoidable skips not in context of all actions taken at the time. The occurrence of these skips is far less the BM Skips.

NOTE: We are continuing to work to provide these datasets during December.

Data Explorer

Data Explorer

Table Information

date

Title Date
Type datetime
Description Datetime slice at 5min intervals
Comment
Example 2024-10-11T23:55:00Z
Unit DateTime UTC

bm_unit

Title BM Unit
Type string
Description BMU ID in merit stack
Comment
Example CONTB-1
Unit

fuel

Title Fuel
Type string
Description Fuel type of BMU
Comment
Example Battery
Unit

bid_offer

Title Bid/Offer
Type string
Description Whether the volume and price refers to a bid or an offer.
Comment
Example Offer
Unit

stage

Title Stage
Type integer
Description Identify which units are still in merit after each stage in skip rate methodology
Comment
Example 5
Unit

available_volume_MWh

Title Available Volume MWh
Type number
Description Total available volume
Comment
Example 100
Unit MWh

average_price_per_MWh

Title Average Price £/MWh
Type number
Description Average price for accepted volume
Comment
Example 100
Unit £/MWh

pair_id

Title Pair Id
Type string
Description A number used to identify a particular Bid-Offer Pair. Values are negative for Bid-Offer Pairs that cover operating levels below Final Physical Notification (FPN) and positive for those that cover operating levels above FPN.
Comment
Example 1
Unit

accepted_volume_MWh

Title Accepted Volume MWh
Type number
Description Total accepted volume
Comment
Example 50
Unit MWh

in_merit_volume_MWh

Title Remaining Available Volume MWh
Type number
Description Remaining available volume that wasn't accepted
Comment
Example 50
Unit MWh

skipped_volume_MWh

Title Skipped Volume MWh
Type number
Description The volume that was skipped
Comment
Example 10
Unit MWh