GC0176 - Introduction of Demand Control Rotation Protocol within Operating Code 6 of the Grid Code
The modification will make changes to OC6 to allow for the Demand Control Rotation Protocol (DCRP) to be formally recognised as a tool to manage shortfalls in electricity supply, over an extended period of time (i.e. 3 to 24 hours).
Modification status:
Current
- GC0176 - Introduction of Demand Control Rotation Protocol within Operating Code 6 of the Grid Code
Last updated:
11 December 2024
Code Administrator Contact: [email protected]
Proposed Governance Route: Standard Governance modification with assessment by a Workgroup
High Impact: on Distribution Network Operators, NESO and Consumers
Code modification proposed by:
Frank Kasibante